Skip to product information
Vesgantti 109' L Shaped Cloud Sectional Couch, Comfy Corduroy Upholstered Modular Couches for Living Room, Modern 3 Seater Sectional Sofa with Ottoman Deep Seat, Beige
Sale price
$146.11
Regular price $393.29
Features & Specs
- Additional Features : Cloud Sectional
- Is Customizable? : No
- Is Modular : Yes
- Item Firmness Description : Medium
- Seat Cushion Configuration : Multiple Cushion Seat
- Seating Capacity : 4.0
- Weight Capacity Maximum : 1000 Pounds
Item details
- ASIN : B0FN8G6PHM
- Additional Features : Cloud Sectional
- Age Range Description : Teen
- Brand Name : Vesgantti
- Collection Name : Vesgantti
- Included Components : 3 Seaters, Installation Tools, Ottoman, User's Manual
- Indoor Outdoor Usage : Indoor
- Item Type Name : Sectional
- Manufacturer : Vesgantti
- Manufacturer Part Number : Cloud Sola
- Model Number : Cloud Sola
- Number of Pieces : 4
- Orientation : Modular
- Room Type : Living Room
- Seat Cushion Quantity : 3
- Set Name : 3 Seater & 1 Ottoman-109' L
- Sofa Type : Sectional
- UPC : 840452643246
- Unit Count : 1.0 Count
Materials & Care
- Cushion Construction : Foam, Layered
- Fill Material : Foam
- Frame Material Type : Wood
- Furniture Leg Material : Wood
- Has Removable Seat Cushion Cover : false
- Material Features : Natural
- Material Type : Wood
- Product Care Instructions : Wipe Clean with Dry Cloth
- Seat Back Fill Material : Foam
- Seat Fill Material : Foam
- Upholstery Fabric Type : Corduroy
Measurements
- Arm Height : 24.8 Inches
- Furniture Wall Clearance : 28.7 Inches
- Item Depth : 55.5 inches
- Item Dimensions : 35 x 109 x 34.3 inches
- Item Dimensions D x W x H : 35'D x 109'W x 34.3'H
- Item Weight : 96.6 Pounds
- Leg Length : 3.15 Inches
- Minimum Required Door Width : 109 Inches
- Seat Back Interior Height : 15 Inches
- Seat Depth : 28.7 inches
- Seat Height : 19.7 Inches
- Seat Interior Width : 106.3 Inches
- Size : 3 Seater & 1 Ottoman-109' L
Style
- Accent Color : Beige
- Arm Style : Pillow-Top
- Back Style : Pillow Back
- Color : Beige
- Cushion Style : Rectangular
- Finish Types : Textured
- Pattern : Solid
- Shape : L-Shape
- Style Name : Modern
- Upholstery Color : Beige
User guide
- Assembly Instructions Description : Included
- Component Connector Assembly : Installation Required
- Includes All Assembly Tools : Yes
- Required Assembly : Yes
- Warranty Type : Limited