Vesgantti 38.5' Accent Chair Light Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom

Vesgantti 38.5' Accent Chair Light Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom

38.5' - 1 Seater Light Gray
Sale price  $57.85 Regular price $159.99
Skip to product information
Vesgantti 38.5' Accent Chair Light Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom

Vesgantti 38.5' Accent Chair Light Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom

Sale price  $57.85 Regular price $159.99
Color38.5' - 1 Seater Light Gray

Features & Specs

  • Additional Features : Back Support, Ergonomic, Space Saving, Upholstered
  • Is Customizable? : No
  • Is Modular : No
  • Item Firmness Description : Plush
  • Reclining Position Count : 1
  • Seating Capacity : 1

Item details

  • ASIN : B0FF3ZYDVQ
  • Additional Features : Back Support, Ergonomic, Space Saving, Upholstered
  • Brand Name : Vesgantti
  • Collection Name : Vesgantti
  • Included Components : Cushion
  • Indoor Outdoor Usage : Indoor
  • Item Type Name : Accent Chair
  • Manufacturer : Vesgantti
  • Manufacturer Part Number : Accent Chair
  • Model Number : Accent Chair
  • Room Type : Bedroom, Dressing Room, Home Theater, Living Room, Office
  • Sofa Type : Standard
  • UPC : 840452662032

Materials & Care

  • Cushion Construction : Foam and Spring Hybrid
  • Fill Material : Foam
  • Frame Material Type : Wood
  • Furniture Leg Material : Wood
  • Has Removable Seat Cushion Cover : false
  • Material Features : Wear-resistant fabric with a smooth, plush feel, Sturdy, solid wood construction
  • Material Type : Corduroy Fabric, Wood
  • Product Care Instructions : Dry Clean Only. Avoid exposure to water or excessive moisture.
  • Upholstery Fabric Type : Corduroy

Measurements

  • Item Depth : 31.5 inches
  • Item Dimensions : 31.5 x 38.5 x 35 inches
  • Item Dimensions D x W x H : 31.5'D x 38.5'W x 35'H
  • Item Weight : 64 Pounds
  • Minimum Required Door Width : 38.5 Inches
  • Seat Depth : 20.9 inches
  • Seat Height : 7 Inches
  • Size : 38.5' - 1 Seater

Style

  • Arm Style : Track
  • Back Style : Cushion Back
  • Color : 38.5' - 1 Seater Light Gray
  • Cushion Style : Boxed Edge
  • Leg Style : Tapered Leg
  • Pattern : Solid
  • Shape : Rectangular
  • Style Name : Modern
  • Theme : Modern
  • Upholstery Color : Light Gray

User guide

  • Assembly Instructions Description : Assembly required. Comes with tools and detailed instructions.
  • Includes All Assembly Tools : Yes
  • Required Assembly : Yes
  • Warranty Type : Limited

You may also like